Public beta scope: AD workflows have real-system path validation, but NOBA is still under active verification. Treat compliance evidence and self-healing claims as evaluation surfaces unless the source and configured state are shown. Read validation boundaries.

AD Migration

One-time migration from an existing directory into NOBA.

7-Step Wizard

  1. Connect — Enter directory credentials and test the connection.
  2. Discover — Enumerate users and groups from the source directory.
  3. Map — Map directory groups to NOBA roles and tenants.
  4. Plan — Generate a migration plan with batch configuration.
  5. Dry Run — Preview all changes without executing.
  6. Execute — Run the migration batch by batch with real-time progress.
  7. Report — Post-migration health check and compliance-oriented evidence summary.

Security

For cross-domain consolidation, see AD-to-AD Cross-Domain or open the interactive mock-data demo.